Commercial, Industrial and Public Works Projects
Orchard Supply Hardware
Fresno, CA 36000 sf
Completed:
February 2012
System: Polished GC: Cooper Chase
Heritage Bomanite polished and dyed the existing concrete floor in this Orchard Supply Hardware improvement. The floor was in bad shape with evidence of ASR, so it was treated with a grout coat to fill all of the spalls. All of the joints were filled with Euclid Quick Joint 200.