Commercial, Industrial and Public Works Projects
Signature Flight
San Jose, CA 240000 sf
Completed:
October 2015
System: Polished GC: Weitz Construction
Heritage Bomanite chemically hardened and sealed over 240,000 SF of concrete in seven plane hangers at the San Jose International Airport. Over 50,000 LF of joints were filled. The products used were Euclid UltraSil Li+ (a lithium silicate concrete densifier), and Euco QuikJoint UVR (a UV resistant poly-urea joint filler).
Job Images
|